Ah well, the result is this:
What has changed since last time?
1. A lot more trees, lighting and benches
2. Already some facades on the left of the square
3. The first blocks for the entrance of the underground parking
4. I excavated the whole parking:
At the far end, I already made a "secret" entrance to the underground canyon. The two pedestrian entrances and the exit are linked, as well as the subway entrance (which still needs A LOT of work).


No comments:
Post a Comment